Summary
The focus of the Transition Phase is to ensure that software is available for its users. The Transition Phase can span
several iterations, and includes testing the product in preparation for release, and making minor adjustments based on
user feedback. At this point in the lifecycle, user feedback should focus mainly on fine tuning the product,
configuring, installing and usability issues, all the major structural issues should have been worked out much earlier
in the project lifecycle.
By the end of the Transition Phase lifecycle objectives should have been met and the project should be in a position to
be closed out. In some cases, the end of the current life cycle may coincide with the start of another lifecycle on the
same product, leading to the next generation or version of the product. For other projects, the end of Transition may
coincide with a complete delivery of the artifacts to a third party who may be responsible for operations, maintenance
and enhancements of the delivered system.
This Transition Phase ranges from being very straightforward to extremely complex, depending on the kind of product. A
new release of an existing desktop product may be very simple, whereas the replacement of a nation's air-traffic
control system may be exceedingly complex.
Activities performed during an iteration in the Transition Phase depend on the goal. For example, when fixing
bugs, implementation and test are usually enough. If, however, new features have to be added, the iteration is similar
to one in the construction phase requiring analysis & design, etc.
The Transition Phase is entered when a baseline is mature enough to be deployed in the end-user domain. This typically
requires that some usable subset of the system has been completed with acceptable quality level and user documentation
so that transitioning to the user provides positive results for all parties.
The primary objectives of the Transition phase include:
-
beta testing to validate the new system against user expectations
-
beta testing and parallel operation relative to a legacy system that it's replacing
-
converting operational databases
-
training of users and maintainers
-
roll-out to the marketing, distribution and sales forces
-
deployment-specific engineering such as cutover, commercial packaging and production, sales roll-out, field
personnel training
-
tuning activities such as bug fixing, enhancement for performance and usability
-
assessment of the deployment baselines against the complete vision and the acceptance criteria for the product
-
achieving user self-supportability
-
achieving stakeholder concurrence that deployment baselines are complete
-
achieving stakeholder concurrence that deployment baselines are consistent with the evaluation criteria of the
vision
The essential activities of the Transition phase include the following:
-
executing deployment plans
-
finalizing end-user support material
-
testing the deliverable product at the development site
-
creating a product release
-
getting user feedback
-
fine-tuning the product based on feedback
-
making the product available to users
Milestone
The Product Release Milestone is where you decide if the objectives of the project were met, and if you should start
another development cycle. See Concept: Product Release Milestone for details.
|